The structure for the new foyer area continues to take shape with weather-resistant barrier installed on the outside of the foyer and temporary walls and door installed to keep the elements out. A picture of the progress is included below. Work will continue on the second floor hallway, the security vestibule, and restroom throughout the winter. The project remains roughly on schedule.